EOS was hired by Juniper to do the project design for its new headquarters in Madrid. Full facilities design was carried out, with a new look, distribution and optimisation of the space.
In-row equipment, hot aisle and air conditioning through high temperature water coolers were our choices, in order to maximize energy savings, and always complying with the customer´s specifications and design guidelines.